Bevel Tech Group, Inc recently completed the counterboring of the 4.5 inch and 8.625 inch OD pipe for the Coulomb Project. Utilizing our dual CNC setup which only requires about 120 ft by 120 ft of work space, the dual CNC setup can maximize the production rate and decrease duration time for the customer. This setup has been utilized on many of our counterboring projects, and can be mobilized at just about any location in the world. Typical electrical requirement is 480 volt and can be supplied by a generator if needed. An air supply of 90 psig at 90 scfm is required also. Bevel Tech Group, Inc provides all the loading and unloading racks and also utilizes our automated loading rack to safely feed the pipe joint into the CNC machine.
Our proven work success in this area is why our Customers continue to call on us to perform their counterboring projects
.