Bonga
Tenaris, one of the main manufacturers of Riser Pipe chose Bevel Tech Group, Inc. to travel to Nigeria to machine the Bonga Project piping at Niger Dock and Onne facilities.
|
|
|
Marco Polo
Bevel Tech Group completed work on Anadarko’s Marco Polo which is located about 150 miles offshore Louisiana in the Gulf of Mexico.
|
|
|
BP Mardi Gras Transportation System
Bevel Tech Group, Inc. completed machining on the SCR pipe that links Mardi Gras with Thunder Horse and its four sister projects. Mardi Gras is considered to be the most complex pipeline installed on the sea floor.
|
|
Shell NaKika
BTG designed and manufactured a special ID tracking unit that would allow us to J prep a 16" x 10" PIP deepwater line for the Shell NaKika Project. view
|
|
BHP Shenzi
Bevel Tech Group, Inc. recently completed field and shop machining of pipe for the Shenzi Project.
|
|
Chevron Tahiti
BTG has done the majority of the field as well as shop machining needed for the Tahiti Project that will be located in the Gulf of Mexico. |
|